Chongqing Linde Technology Development Co., Ltd.

Chongqing Linde Technology Development Co., Ltd.

Manufacturer from China
Site Member
7 Years
Home / Products / Wastewater Treatment System /

Food Wastewater Treatment System Pharmaceutical Centrifuge Chemical Petroleum

Contact Now
Chongqing Linde Technology Development Co., Ltd.
City:chongqing
Province/State:chongqing
Country/Region:china
Contact Person:MsXiang
Contact Now

Food Wastewater Treatment System Pharmaceutical Centrifuge Chemical Petroleum

Ask Latest Price
Video Channel
Place of Origin :China
Brand Name :Linde
Certification :ISO9001, CE, SGS
MOQ :Negotiable
Price :Negotiable
Packaging Details :Export standard wooden case(plywood), no need to fumigate, suitable for shipping.
Delivery Time :1-7working days(depand on raw materials stocking)
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :>300sets/month
Product Name :Food Wastewater Treatment System
Feature :Easy Operation
Application :Wastewater Treatment System
Specification model :Professional customization
Warranty :1 Year
Weight :OEM
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Centrifuge Chemical Petroleum Food Pharmaceutical Wastewater Treatment System

Advantages: strong versatility, wide application range, stable start, easy operation

1) Equipment Name: Centrifuge

2) Use occasions: chemical, petroleum, food, pharmaceutical and other occasions

3) Equipment picture:

Food Wastewater Treatment System Pharmaceutical Centrifuge Chemical Petroleum

Equipment diagram:

Food Wastewater Treatment System Pharmaceutical Centrifuge Chemical Petroleum

Installation site picture:

Food Wastewater Treatment System Pharmaceutical Centrifuge Chemical Petroleum

Supply (cooperation) mode and delivery cycle

1: Determine the usage scenario.

2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)

3: Determine the treatment process.

4: The supplier forecasts the price duration and governance objectives of the equipment or system.

5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.

6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.

8: System training for equipment use and maintenance.

Inquiry Cart 0