
Add to Cart
Coal Washing Wastewater Treatment System Boiler Waste Water Industrial Wastewater
1) Equipment Name: Coal washing wastewater treatment equipment
2) Use occasions: It is suitable for rapid purification of industrial wastewater containing a large amount of suspended solids, coal slurry water, boiler waste water, sewage, chemical industry and other industrial wastewater
3) Process application flow chart:
Process description:
The water in the clear water pool enters the coal washing machine through the pipeline to carry out the coal washing operation. The coal slurry water generated during the coal washing process passes through the linear sieve into the sieved water after the micro coal sieve treatment, and enters the water collecting tank under the water collecting bin or coal sieve; The sieve water enters the pretreatment device under the action of the flotation machine sewage pump, and then goes to the flotation machine.
The float liquid treated by the flotation machine is discharged into the flotation cell and the coal mud liquid is discharged into the coal mud pool; The floating liquid in the pool enters the flocculation filter press under the action of the filter pump of the filter press, and the clean water discharged by the flocculation filter press is discharged into the clear water pool; the slime liquid in the coal mud pool passes through the thickener The feed pump enters the thickener, and the added agent is treated by the thickener to form clean water and slime, and the clean water is discharged into the clear water pool. The slime enters the slime filter press under the action of the coal slime filter press feed pump.
The clear water is discharged into the clear water pool through the pipeline, and the invention is rationally designed to realize the recycling of sewage treatment.
Installation site:
Advantages: good processing effect, convenient operation and simple operation.
Supply (cooperation) method and delivery cycle
1: Determine the usage scenario.
2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)
3: Determine the treatment process.
4: The supplier forecasts the price duration and governance objectives of the equipment or system.
5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.
6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.
7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.
8: System training for equipment use and maintenance.
Supply (cooperation) mode and delivery cycle
1: Determine the usage scenario.
2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)
3: Determine the treatment process.
4: The supplier forecasts the price duration and governance objectives of the equipment or system.
5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.
6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.
7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.
8: System training for equipment use and maintenance.